aPlanner is in MVP validation (Oct–Dec 2026). Figures are design targets. Join the 2027 Korea pilot →
RESOURCES

For fab planning teams

What exists today: the 2027 design-partner program, the MVP prototype preview, one technical article from the founder and two planning tools. Guides, webinars and recordings follow after the December 2026 OASIS-6 presentation.

FROM THE FOUNDER

Technical writing

Technology

Yield-aware scheduling: why Excel breaks at 100 process steps

Reentrant flow, a tool × recipe × chamber capacity matrix, batch tools, cycle time as a distribution and yield that arrives six weeks late — why a spreadsheet cannot hold a fab, and what changes when yield lives inside the optimizer.

Danniel Nguyen, FounderOctober 20267 min read
In preparation
Article
Node-migration planning: 176L → 236L → 300L+ without demand gaps
Article
Explainable re-planning: frozen, flex and far zones in practice
Guide
Planning readiness in a Korean fab: data, systems, constraints
Video
OASIS-6 presentation recording and prototype walkthrough (EN / KR)

Published after the December 2026 OASIS-6 presentation. No dates are promised before then.

INTERACTIVE TOOLS

Two planning tools

Estimates are based on published industry benchmarks and aPlanner design targets, not on aPlanner customer data.

Planning Maturity Assessment

A 10-minute self-assessment across five planning dimensions, scored against published industry practice.

Take assessment

Opportunity Estimator

Estimate the planning opportunity for your site from published benchmarks and aPlanner design targets.

Estimate opportunity

Questions the pages do not answer?

Write to the founder directly at danniel@amoza.ai or apply for the 2027 Korea pilot program.