aPlanner is in MVP validation (Oct–Dec 2026). Figures are design targets. Join the 2027 Korea pilot →
IMPLEMENTATION SERVICES

A pilot on one line, in weeks — not a roll-out in years

The target we are validating in 2027: aPlanner connected read-only to one production line and running next to the current process within 8–12 weeks. Nothing is ripped out; write-back comes after sign-off.

IMPLEMENTATION PACKAGES

Two steps: pilot, then roll-out

The pilot is the only implementation package available in 2027. The Starter roll-out follows for lines that meet their pilot criteria; multi-site Professional and Enterprise roll-outs are scoped from 2028.

Pilot on one line

KOREA 2027

The 2027 Korea pilot program — Korean fabs, OSATs, tier-1/2 suppliers

8–12 weeks (target)
KRW 75–150M (≈ US$55–110K)
Read-only connectors to MES, ERP, yield / bin DB and planner spreadsheets
On-premise or private-cloud deployment inside the fab network
Four modules run side-by-side with the current planning process
Planner onboarding in Korean and English
Review against the success criteria agreed in the readiness assessment
Apply for the pilot

Starter roll-out

Single site, after a successful pilot

8–12 weeks (target)
Scoped per site · quoted in KRW
Write-back of approved plans to MES / ERP after sign-off
Starter subscription (KRW 120–300M / yr) activated
SSO, RBAC and audit trail configured to site policy
Training for the planning team and operations managers
Stabilization period and hand-over to support
Talk to the founder
IMPLEMENTATION METHODOLOGY

The five-phase pilot plan

Our Discover-Design-Deliver-Deploy-Drive methodology has been refined through dozens of manufacturing deployments. Each phase has defined inputs, outputs, and quality gates.

01

Discover

1-2 weeks
Requirements gathering
Current state assessment
Success criteria definition
Project plan creation
02

Design

1-3 weeks
Solution architecture
Business rules configuration
Integration design
Workflow mapping
03

Deliver

4–8 weeks
System configuration
Data integration
Model calibration
User acceptance testing
04

Deploy

1-2 weeks
Production deployment
User onboarding
Go-live support
Performance monitoring
05

Drive

Ongoing
Continuous optimization
User feedback collection
Performance tuning
Handover to support
ADDITIONAL SERVICES

Extend your implementation

Data Integration

4–8 weeks
Scoped per site · quoted in KRW

Custom connectors for in-house MES, additional ERP instances and yield databases beyond the standard set.

User Training

2–4 weeks
Scoped per site · quoted in KRW

Role-based training for planners, dispatch and management, in Korean and English.

OUR GUARANTEES

Commitments we make to every pilot partner

On-time delivery

Milestone-based plan agreed in the readiness assessment, with weekly status reviews during the pilot.

Risk mitigation

Read-only first, write-back only after sign-off; the current planning process keeps running throughout the pilot.

Knowledge transfer

Your team is trained and empowered to manage aPlanner independently after go-live.

Success metrics

Success criteria written before the pilot starts and measured against the line’s own baseline.

Apply for the 2027 pilot

Pilots are preceded by a Planning Readiness Assessment that fixes the line, the data sources and the success criteria. Korean fabs, OSATs and tier-1/2 suppliers are eligible.

Read-only first
Criteria agreed up front
Knowledge transfer