aPlanner is in MVP validation (Oct–Dec 2026). Figures are design targets. Join the 2027 Korea pilot →
INVESTOR INFORMATION

Korea’s AI planning engine — built from Korea

Pre-founder stage: one founder, two Siemens Industry Software advisors, five partners, a US$100K self-funded bootstrap and working prototypes. Amoza Korea Co., Ltd. incorporates in 2027; a US$800K Pre-Seed is targeted for Q2–Q3 2027 after incorporation.

No legal entity, no revenue, no funding round closed yet
THE OPPORTUNITY

Why Korea. Why now. Why this founder.

≈ US$173B
Korean semiconductor exports 2025
Record high (U.S. ITA market brief)
16 fabs
Yongin–Pyeongtaek mega-cluster
≈ US$413B private investment planned by 2047
Korean fabs
Beachhead
Leading Korean NAND-flash and DRAM manufacturers — no engagement signed yet

The problem we solve

Pain Point

$100M+ annual losses per large fab

Root Cause

Legacy tools, manual processes, poor forecasting

Current Solutions

Spreadsheets, 20-year-old software, consultants

The Gap

No AI-native platform built for complex manufacturing

Market growth drivers

AI Adoption Accelerating

Manufacturers actively investing in AI-powered planning to replace legacy tools and manual processes.

Legacy Replacement Cycle

Planning tools that are 15-20 years old are reaching end-of-life, creating a massive replacement wave.

Digital Transformation Urgency

Post-pandemic supply chain disruptions have accelerated investment in modern planning technology.

Supply Chain Investment

Global supply chain disruptions are driving unprecedented investment in planning and visibility tools.

BUSINESS MODEL

SaaS + expert services, priced in KRW

Software pays for scale, services pay for trust — and in Korean manufacturing, trust is earned on the shop floor. Services are about 60% of revenue in the launch year and fall to about 15% at scale. One price list is used on both aplanner.amoza.ai and www.amoza.ai. Prices in KRW per year; USD equivalents approximate. One price list is used on aplanner.amoza.ai and www.amoza.ai.

aPlanner Product (SaaS)

Starter
KRW 120–300M/yr (≈ US$100–250K)
Professional
KRW 400M–1B/yr (≈ US$300–750K)
Enterprise
KRW 1B–2.5B+/yr (≈ US$750K–1.9M+)

Services (≈ 60% in 2027–28 → ≈ 15% at scale)

Planning Readiness Assessment
KRW 50–100M · 2–4 weeks
Pilot on one line
KRW 75–150M · 8–12 weeks
Implementation & AI tuning
Scoped per site, KRW
Support & managed services
Included in editions; 24×7 in Enterprise

Revenue mix evolution (plan)

Unit economics (plan): ACV KRW 270M → 650M; LTV:CAC 7.5× (Y2) → 20× (Y3); NRR > 130% via MAKE-pillar cross-sell. Plans, not results.

PeriodServicesSaaSNote
2026–27 (Bootstrap)——No revenue; self-funded US$100K
2027–28 (Launch)≈ 60%≈ 40%Assessment + pilot → first Starter subscription
2028–29 (5–10 customers)≈ 35%≈ 65%Second customer, aMonitor add-on
At scale≈ 15%≈ 80–85%SaaS 85–90% gross margin; NRR > 130% target
NEAR-TERM PLAN — THEN THE LONG VIEW

18 months: OASIS-6 → D-8-4 → Korean pilot

The sequence matters: award, IP, company, visa, pilot. OASIS-6 is the first domino.

Now
Oct 2026 – Mar 2027

OASIS-6 · IP · MVP validation

  • OASIS-6 competition; OASIS-4/5
  • KIPO patent application #1; trademarks Amoza / aPlanner
  • aPlanner MVP validation on synthetic fab data; Korean UI
Next
Mar – May 2027

Amoza Korea Co., Ltd. · D-8-4

  • Incorporate Amoza Korea (Incheon Songdo or Suwon — TBC) with OASIS-8
  • TIPS / Pre-startup Package applications
  • D-8-4 change of status; pilot contract negotiation
Planned
May – Sep 2027

First Korean fab pilot · Pre-Seed

  • First Korean fab pilot (one line, 8–12 weeks) after a paid readiness assessment
  • Hire 2 Korean engineers (planning domain + MES integration)
  • Pre-Seed US$800K (≈ KRW 1.1B)
Planned
Oct 2027 – Mar 2028

Pilot → Starter subscription

  • Convert pilot to Starter subscription (first KRW revenue)
  • Second Korean customer (supplier / OSAT)
  • SOC 2 Type II — planned 2027–28; Seed preparation
Planned
2028 – 2029

5–10 Korean customers · aMonitor

  • 5–10 Korean customers
  • aMonitor (factory monitoring) add-on
  • Seed US$2M; Singapore / Vietnam from the Korea HQ

The 17-year direction

Long-term vision only; figures beyond 2029 are direction, not forecasts.

Bootstrap

2026 – Mar 2027
Revenue
$0
Focus
Build & Validate
Founder + 2 Siemens Industry Software advisors + 5 partners
Personal research — no legal entity yet; US$100K self-funded
Working prototypes of scheduling, simulation and analytics on synthetic fab data; forecasting engine prototyped, dedicated view in the December 2026 build.
OASIS-6; KIPO patent application #1; trademarks Amoza / aPlanner

Launch

2027 – 2028
Revenue
First KRW revenue
Focus
Korea Market Entry
Amoza Korea Co., Ltd. incorporated; D-8-4
First Korean fab pilot after a paid readiness assessment
Pre-Seed US$800K (≈ KRW 1.1B), Q2–Q3 2027
Pilot → Starter subscription; second customer (supplier / OSAT)

Scale Up

2028 – 2030
Revenue
KRW 2–7B
Focus
Korean cluster + aMonitor
5–10 Korean customers (fabs, OSATs, suppliers)
Seed US$2M (2028) after revenue from 3+ customers
aMonitor add-on; Singapore / Vietnam from the Korea HQ
Series A after the Korean reference base

Scale Out

Years 7-9 (direction)
Revenue
$30M-$100M
Focus
Regional Expansion
Series B funding ($30M-$50M)
EU and Americas expansion
Product ecosystem maturing
$30M-$100M revenue

Growth Up

Years 10-12 (direction)
Revenue
$300M-$1B
Focus
Category Leadership
Series C funding ($300M-$500M)
Category leadership position
Acquisition opportunities
$300M-$1B revenue

Globalization

Years 13-17 (direction)
Revenue
$1B-$10B
Focus
Global Dominance
IPO readiness
Global market presence
Full ecosystem deployed
$1B-$10B revenue
COMPETITIVE ADVANTAGES

Three advantages no overseas vendor can copy quickly

Overseas vendors fail the Korean fab’s first three questions: where is my data, does it talk to my MES, and who answers the phone in Korean at 7 a.m.? Plus the IP and the capital discipline to get there.

Semiconductor-specific IP

Yield-aware constraint scheduling and node-migration planning

KIPO applications planned Dec 2026 / Q1 2027

Founder in the fab

Years of Siemens Industry Software / Samsung Electronics project work in Korea

Relationship-based entry

Data stays in the fab

On-prem / private cloud first — where cloud-first incumbents stall

Clears the #1 objection

Korean users, Korean support

Korean UI, KRW contracts, team within an hour of the cluster

No overseas vendor has it

Capital efficiency

US$100K bootstrap already produced working prototypes

Public programs before equity
INVESTMENT OPPORTUNITY

Investment highlights

Korea is the center of gravity of memory manufacturing — 2 of the top-3 memory makers, 16 new fabs planned
Clear pain — US$100M+ a year per large fab lost to manual planning
Timing — SAP APO end-of-life; AI-first vendors built for consumer supply chains, not fabs
Team — founder with Siemens Industry Software / Samsung Electronics project experience in Korea, 2 Siemens Industry Software advisors, 5 partners
Capital efficient — US$100K bootstrap produced working prototypes; Korean public programs before equity
Honest stage — pre-commercial MVP, no legal entity yet, no customers; the plan is sequenced: award → IP → company → visa → pilot

Use of Pre-Seed (12 months)

Milestones unlocked: pilot live → first KRW revenue → 3 customers → Seed.

Product & AI50%
Korean GTM & pilots20%
Korea operations & hiring15%
Legal, IP, compliance15%

Sources of funding (stacked)

1
Founder self-funding
Committed
US$100K
Personal research; funds the Bootstrap year to Mar 2027
2
OASIS-6 prize + Korean public programs
Dec 2026 – 2027
KRW 300–500M target
TIPS (R&D), Pre-startup Package, K-Startup Grand Challenge, Incheon / Gyeonggi startup support
3
Pre-Seed
Q2–Q3 2027
US$800K (≈ KRW 1.1B)
SAFE, Korean angels / accelerators, pre-money US$3–5M; after Korean incorporation — not secured
4
Seed
2028
US$2M
After KRW revenue from 3+ customers; aMonitor; APAC from Korea
5
Series A and beyond
Direction only
—
Sized after the Korean reference base
EXIT STRATEGY

Long-term options (direction only)

Exit options

OptionTimelineValuation Range
Strategic AcquisitionYears 4-6 (direction)Not modelled publicly
PE BuyoutYears 7-9 (direction)Not modelled publicly
Continue GrowthYears 10-12 (direction)Not modelled publicly
IPOYears 13-17 (direction)Not modelled publicly

Potential acquirers / partners

CategoryCompaniesStrategic Fit
Enterprise Software
SAP, Oracle, MicrosoftAdd AI planning to suite
Industrial Software
Siemens, Dassault, PTCManufacturing footprint
Private Equity
Vista, Thoma BravoSaaS consolidation
Strategic Corporates
Memory and foundry groups, Korean SI / MES vendorsVertical integration

Talk to the founder about the Pre-Seed

Korean angels, accelerators and TIPS operators who understand manufacturing: the OASIS-6 IR deck is available on request after the December 2026 presentation. E-mail the founder directly.

danniel@amoza.ai
Korea first
Capital-efficient
Honest stage